Opening day can slip when electrical work misses a permit or an inspection. Dunwoody businesses’ commercial electrical code starts with the 2023 National Electrical Code, which Georgia has used as its state minimum since January 1, 2025. Your project must also clear City of Dunwoody permits and inspections. Here is what to plan for before work begins.
Which Commercial Electrical Code Applies in Dunwoody?
Georgia’s state minimum is the 2023 National Electrical Code (NEC). The City of Dunwoody issues permits and inspects the work.
Other codes, such as fire and energy rules, can apply in addition to the NEC, and local requirements may differ. Where a rule is unclear, the city’s permit staff and inspectors have the final word.
Our Dunwoody commercial electrical team builds each project around local codes, from tenant improvements to ground-up construction.
When Does Commercial Electrical Work Need a Permit?
The City of Dunwoody says anything beyond carpeting and painting needs a building permit, and applications go through its eTRAKiT portal. Treat new circuits, panel changes, and rewired lighting as permit work. Engineered electrical drawings typically go in with the application, and larger projects may need a licensed engineer’s stamp.
A typical sequence runs plan submittal, a rough-in inspection before walls close, then a final inspection that leads to the certificate of occupancy. A failed rough-in is the biggest cause of build-out delays, because walls must be reopened.
Engineered electrical drawings typically go in with the permit application. Unpermitted work can be red-tagged, delaying your opening date. Keep the permit record and final inspection sign-off on file once the work ends. Our guide to commercial electrical requirements for a tenant build-out walks through the sequence.
What Does Commercial Electrical Code Require Inside the Space?
Expect a load calculation, enough panel capacity, dedicated circuits for heavy equipment, battery-backed emergency lighting, and energy-compliant lighting. Inspectors test life-safety items before signing off.
- Load calculation: It shows if your service can carry a restaurant kitchen, medical devices, or server racks.
- Panel capacity: Specialized equipment often needs a subpanel or upgrades to the commercial panel.
- Life safety: Exit signs and emergency lighting are required in nearly every commercial occupancy and must switch on automatically when power is lost.
- Accessibility: Public-facing spaces typically need switches and outlets at accessible heights.
- Lighting: Most jurisdictions require energy-compliant fixtures, usually LED with occupancy sensors where applicable. See our lighting installation page.
A restaurant strains kitchen circuits, a medical office adds specialized devices, and a warehouse often depends on three-phase power. Ask for a site assessment before you sign a lease, and read the lease closely: it defines what the base building electrical includes and what counts as tenant improvement work.
Restaurants, medical offices, and gyms often find capacity gaps during the load calculation, so ask for a site assessment before you sign a lease. Read the lease closely, too, because it defines what counts as tenant improvement work.
Do Commercial Panels Need Arc Flash Labels?
Often, yes, for large equipment. Under the 2023 NEC, service equipment and feeder-supplied equipment rated 1,000 amperes or more, outside dwelling units, need an arc flash warning label applied at installation.
The label shows the installation date and warns workers about the hazard before they open the equipment. Smaller buildings may fall below that threshold, so ask your electrician to check your equipment ratings.
How Do You Avoid Common Code Delays?
Run the load calculation first, never assume existing wiring meets current code, and pull permits before work starts. Older buildings may have been permitted under a previous code cycle and never updated.
Hire a contractor with commercial experience, because a home electrician unfamiliar with three-phase systems can misjudge loads. Our post on hiringa licensed electrician lists the questions to ask.
Conclusion
Commercial electrical code is manageable when you treat it as a schedule item, not a surprise. Confirm the NEC edition, pull the permit, run the load calculation, and plan for both inspections.
Bray Electrical is a locally owned, family-operated contractor, licensed and insured in Georgia since 2004. Planning a build-out or upgrade? Contact our commercial team before you build, renovate, or open.
Frequently Asked Questions
Georgia sets the 2023 NEC as the state minimum. Cities handle permits and inspections, so ask Dunwoody if local requirements apply.
The City of Dunwoody’s Community Development Department handles permits and inspections. Your electrician typically schedules them.
Yes. We manage permits, coordinate with general contractors, and schedule inspections for our commercial electrical projects.
It adds up the demand of your equipment and lighting, then compares it with what your service and panel can supply.
It can be red-tagged, which delays your opening date. Pulling the permit first keeps the inspection schedule predictable.